Prepared 7 valve sites for future connections
10 miles of 14" Hydrogen Pipeline from Webster, Tx to Bayport, Tx
8 miles of 10" from Exxon Chemical to Cedar Bayou valve setting at Mt. Belvieu
5 miles of 8" in Decatur, Tx
4.6 miles of 10" in Decatur, Tx
12.4 miles 12" in Gainesville, Tx
Make ready to Line 17, 5 20" launcher/receivers, and regulator station
Replaced seven 36 inch valves on Pasadena Station Manifold
Lay 6 each 16" and 1 each 36" crude oil lines in one ditch to storage 3200' away
7 line new plant tie-in across Underwood Rd.
Relocate 11,000' of dual 16" pipelines for Port Road expansion project
Lay 8 1/2 miles of 30"pipeline between Sunoco Terminal and Motiva refinery
Pump Station & Transfer lines for the Motiva Project
Re-rated 30 miles of 4" line
Re-rated 28 miles of 4" line
Additional projects we have handled:
8 miles of 8" Mobil Terra to Neches Station
Re-rated 32 miles of 8" Bridge City, Louisiana
Baytank to American Acryl Connection
7 miles of 12" Finished Product Pipeline
5 miles of 20" Finished Product Pipeline from Valero to BP Plant on Grant Road
5 miles of 8" in Decatur, Tx